Complex construction of artificial structures is the central activity of Mostostroy No. 6.

Over the years, the trust has erected and reconstructed the most complex objects, including: 6 bridges across the Neva, 8 bridges across the Volga, 12 bridges across the Volkhov, 3 bridges across the Northern Dvina, 5 bridges across the Sukhona, 2 bridges across the Sheksna, artificial structures on Oktyabrskaya, Moscow and Northern Railways.

The company has counted dozens of constructed and reconstructed hydraulic structures with a high level of responsibility, including facilities in the zone of severe climatic conditions, as well as with berths deeper than 14 meters. Including such unique facilities as the underwater Kanonersky tunnel, a dock for floating docks at the storage facility for nuclear submarine compartments in the Sayda Bay, oil loading terminals in Vysotsk, Primorsk, Ust-Luga.

Mostostroy No. 6 acts as a general contractor and general designer of projects for the construction and reconstruction of highways. The company's specialists carry out work in difficult geoclimatic conditions, without interruption in the movement of rail, water and road transport, with a comprehensive reorganization of engineering networks. The company participated in the construction of important sections of the St. Petersburg roundabout, Western high-speed diameter, federal highways to Finland, Lithuania and Norway.

  1. Rail
    and automobile bridges

  2. Overpasses

  3. Overpasses

  4. Transportation
    and pedestrian tunnels

  5. Embankments, sea
    and river moorings

  6. Car roads

objects
07.08.2015

The company "Mostostroy No. 6" congratulates all employees on the day of the builder!

22.06.2015

Crocus International has entered into a strategic agreement with Bridge No. 6 for the construction of the Central Ring Road

03.06.2015

The Minister of Transport of the Russian Federation Maxim Sokolov has opened traffic on the bridge across the river. Volkhov on the P-21 Cola highway