Bridges and roads
19.03.2019

Construction of a temporary bypass bridge over the Kobylka River

Construction of a temporary bypass bridge and a path across the Kobylka River at km 0 + 558 of the Tsapelka-Plyussa highway in the Strugokrasnensky district of the Pskov Region Customer - State Committee of the Pskov ...
Bridges and roads
19.03.2019

Reconstruction of the bridge over the river. Coexisting

Reconstruction of the bridge over the river. Syazya on km 135 + 216 of the highway M-18 "Cola" in the Leningrad region. Main parameters of the facility: Bridge length - 235,1 m Full ...
Bridges and roads
19.03.2019

Reconstruction of artificial road structures of the Obvodny Canal embankment

Reconstruction of artificial road structures “The southern and northern sides of the embankment of the Obvodny Canal from Dnepropetrovskaya st. to Ataman bridge »The length of the reconstructed section is 1950 m 1. Building…
Bridges and roads
19.03.2019

Reconstruction of the bridge over the river. Pechengu

Reconstruction of the bridge over the river. Pechengu at km 1517 of the M-18 Kola highway - from St. Petersburg via Petrozavodsk, Murmansk, Pechenga to the border with Norway (international ...
Bridges and roads
19.03.2019

Reconstruction of the bridge over the Kanda Guba River

Reconstruction of the bridge over the Kanda-Guba river in the Murmansk region at 1137 km of the M-18 Kola highway from St. Petersburg through Petrozavodsk, Murmansk, Pechenga to the border with Norway ...
Bridges and roads
19.03.2019

Construction of an automobile overpass in Mirny

Construction of an automobile overpass at the intersection with the railway at the site: st. Plesetskaya - Mirny with a bypass road. Construction of a section of the highway connecting the city ...
Bridges and roads
19.03.2019

Overhaul of the bridge over the Syas river

Overhaul of the bridge over the Syas river at km 515 + 372 of the A-114 highway Vologda - Novaya Ladoga to the Kola highway (via Tikhvin), Leningrad Region; Main parameters:…
Bridges and roads
19.03.2019

Construction of a bridge over the Shuya river

The construction of a bridge over the Shuya River and 3 traffic intersections on the M-18 Kola administrative road - from St. Petersburg via Petrozavodsk, Murmansk, Pechenga to the border with Norway ...
Bridges and roads
19.03.2019

Reconstruction of the Bolshoi Petrovsky Bridge in St. Petersburg

Reconstruction of the Bolshoi Petrovsky Bridge over the Malaya Nevka River in St. Petersburg The length of the bridge is 294,3 m. The number of lanes on the bridge and approaches is 4 lanes.…
Bridges and roads
19.03.2019

Overhaul of Finland Railway Bridge

Overhaul of the drawbridge and channel supports of the Finland railway bridge on 4-5 km II of the Oktyabrskaya railway line of the Glukhozerskaya - Dacha Dolgorukova assembly and ...
Bridges and roads
19.03.2019

Gun gun tunnel under the Sea Canal in Leningrad

An auto transport underwater tunnel under the Sea Canal on Kanonersky Island connects Gutuevsky (Dvinskaya Street) and Kanonersky Islands. Built for two lanes - one…
Bridges and roads
19.03.2019

Construction of the “Drive along the southern coast of the Obvodny Canal” object 2 stage

Construction of the “Drive along the southern coast of the Obvodny Canal from the Glukhoozerskoye Highway to Obukhovskoy Oborony Ave. with a bridge over the Obvodny Canal bucket and a ...
Bridges and roads
19.03.2019

Reconstruction of the bridge over the Volkhov River at km 122 + 085 of the M-18 Kola highway in the Leningrad Region

Customer - FKU Sevzapravtodor General Contractor - Mostostroy No. 6 General Designer - Institute Giprostroymost Institute - St. Petersburg CJSC Cost of work - 3,5 billion rubles Work on ...
Bridges and roads
19.03.2019

“Transport interchange at the intersection of Piskarevsky Avenue and Nepokorenny Avenue”, St. Petersburg.

Customer: Committee for the Development of Transport Infrastructure of the Government of St. Petersburg General Contractor: Mostostroy No. 6 General Designer: Lenpromtransproekt CJSC Cost of work: 2,963 billion rubles. Work at the facility will last from ...
Bridges and roads
19.03.2019

Construction of the “Drive along the southern coast of the Obvodny Canal” facility

Construction of the object "Drive along the southern coast of the Obvodny Canal from the Glukhoozerskoye Highway to Obukhovskaya Ave., with a bridge over the bucket of the Obvodny Canal and a ...
Bridges and roads
19.03.2019

Transport interchange at the intersection of Zelenogorsk Highway and Bolshoi Prospekt Kurortny District of St. Petersburg

Construction of a traffic intersection at the intersection of Zelenogorsk Highway and Bolshoi Prospekt Kurortny District of St. Petersburg with the railway ways of the Vyborg direction in the area of ​​railway Repino Station, St. Petersburg. Customer:…
Bridges and roads
19.03.2019

Reconstruction of urban roads of Mirny

Reconstruction of urban roads (Nedelin St., Gagarin St., Lomonosov St., Ovchinnikov St., Mira St., Stepachenko St., Dzerzhinsky St.) in Mirny, the Arkhangelsk Region. The customer of the construction ...
Bridges and roads
19.03.2019

Reconstruction of Sinop embankment

Reconstruction of Sinop embankment from emb. Bypass channel to the street. Moiseenko. 2-th turn. Sinopskaya emb. from Kherson passage to Obvodny canal. 2 stage Customer: SPb GKU ...
Bridges and roads
19.03.2019

Construction of a bypass of Sovetsk with a bridge over the Neman River

Construction of a bypass in Sovetsk with a bridge over the Neman River, km 51-61,4 on the A-216 highway “Gvardeysk-Neman to the border with the Republic of Lithuania. The customer for the construction is the State Treasury ...
Bridges and roads
19.03.2019

Reconstruction of the bridge over the Volkhov River at km 122 + 085 of the M-18 Kola highway (1 stage)

Customer: FKU "Sevzapravptodor" General contractor: "Bridge №6" Cost of work: 1 548 007 004 rub. During the construction work, reconstruction of the bridge must be completed ...
Bridges and roads
19.03.2019

Reconstruction of the bridge over the Volkhov River at km 122 + 085 of the M-18 Kola highway (2, 3 stage)

Customer: FKU "Sevzapravptodor" General contractor: "Bridge №6" Cost of work: 2 000 462 421 rub. During the construction work, reconstruction of the bridge must be completed ...
Bridges and roads
19.03.2019

Repair of the overpass through the road and railroad at km 472 + 062 of the P-21 Kola highway

Customer: Federal State Institution “Highway Administration St. Petersburg-Murmansk of the Federal Road Agency” (PKU Urddor “Kola”) General contractor: “Mostostroy No.6” Cost of work: 62 062 740 rub. IN…
Bridges and roads
19.03.2019

Construction of the Moscow-St. Petersburg High-Speed ​​Road on the 58 km - 684 section

Customer: MOSTOTREST General contractor: Mostostroy No. 6 Cost of work: 629 799 478,25 rub. During the construction work should be performed on construction, maintenance, repair, overhaul ...
Bridges and roads
19.03.2019

Construction of an overpass at km 116 + 111 and reconstruction of the bridge over the Yagorba river at km 116 + 382

Customer: VAD Closed Joint-Stock Company General contractor: Mostostroy No. 6 Cost of work: 225 000 047,08 rub. Deadline: from 15.09.2014 to 10.10.2015
Bridges and roads
19.03.2019

Carrying out rear pairing device Berth No.17

Customer: FSUE "GUSST №4 under the Special Construction of Russia General Contractor:" Mostostroy No.6 "Cost of work: 363 702 671 rub. During the construction work should be performed on ...
Bridges and roads
19.03.2019

Reconstruction of the road in Mirny

Customer: MU "Management of Architecture of Construction and Housing and Public Utilities" General Contractor: "Bridge №6" Cost of work: 640 581 080 rub. During construction, work must be done on ...
Bridges and roads
19.03.2019

Construction of a road overpass through the railway to the city of Velikiye Luki, Pskov Region

The customer of the construction is the Municipal Institution “Housing and Communal Services Administration of the Administration of Velikiye Luki” General Contractor: “Mostostroy No.6” Contract Value: 2 billion 59 million 202 thousand rubles ...
Atomic projectsBridges and roadsASGDesign
19.03.2018

Archival objects "Mostostroy No. 6"

The company "Mostostroy No. 6" during its entire existence has completed a huge number of objects. Information about some of them is only in the archives. Reconstruction of the railway bridges over Obvodny ...

For more than 70 years, Mostostroy No.6 has built and reconstructed thousands of bridges, overpasses, overpasses, industrial and civil structures throughout Russia: from Kaliningrad to Yakutia, from the southern regions to the permafrost of the Yamal Peninsula. Each of these objects became a landmark in the history of domestic construction and a breakthrough in engineering.

07.08.2015

The company "Mostostroy No. 6" congratulates all employees on the day of the builder!

22.06.2015

Crocus International has entered into a strategic agreement with Bridge No. 6 for the construction of the Central Ring Road

03.06.2015

The Minister of Transport of the Russian Federation Maxim Sokolov has opened traffic on the bridge across the river. Volkhov on the P-21 Cola highway